Search results

1 – 8 of 8
Article
Publication date: 24 September 2021

Salman Shooshtarian, Savindi Caldera, Tayyab Maqsood, Tim Ryley and Malik Khalfan

The literature shows that the current Australian waste management framework does not meet industry and government expectations. This study, therefore, seeks the key construction…

1875

Abstract

Purpose

The literature shows that the current Australian waste management framework does not meet industry and government expectations. This study, therefore, seeks the key construction and demolition (C&D) stakeholders' insights on various issues identified. It aims to understand the main barriers to effective C&D waste management, examining the role of the federal government and exploring perceptions around waste regulations, policies and schemes.

Design/methodology/approach

An online survey was conducted in 2019 to capture stakeholder perceptions. One hundred and thirty-two participants from various industries and government agencies representing Australian jurisdictions took part in the survey. Quantitative and qualitative data were collected.

Findings

The results show that the main barriers are “overregulation, tough acceptance criteria and increased testing requirements”, “lack of local market” and “culture, poor education and low acceptance”. The main areas of improvement include “providing a guideline that determines the accepted level of contamination for reusing C&D waste”, “preparation of guidelines on requirements of using recycled C&D materials in different industries” and “setting a target for reduction, reusing and recycling C&D waste”.

Research limitations/implications

Some research findings may not be generalisable beyond Australia, but there are interesting insights for an international audience. The results inform policy development within the Australian states and territories context, to support the design and implementation of a circular economy model in the construction industry. The findings are evidence for a broader discussion to solve prevailing issues in C&D waste management, notably in the context of construction materials' end of life management.

Practical implications

The study highlights that policy development needs to be further expanded to include new/current waste management schemes including manufacturer's shared responsibility of waste generation, subsidies for C&D waste recycled materials and the proximity principle.

Originality/value

This paper provides a clear insight into C&D waste management stakeholders' perceptions towards the current waste management system in Australia.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 November 2023

Salman Shooshtarian, Tayyab Maqsood, Peter S.P. Wong, Savindi Caldera, Tim Ryley, Atiq Zaman and Ana María Cáceres Ruiz

The utilisation of products with recycled content (PwRC) in construction projects has been identified as a targeted way to achieve sustainable management of construction and…

Abstract

Purpose

The utilisation of products with recycled content (PwRC) in construction projects has been identified as a targeted way to achieve sustainable management of construction and demolition waste resources. However, sustainable applications of these resources are subject to a wide array of factors that demand a thorough investigation. This study, therefore, explores the motivations, barriers and strategies for optimal PwRC uptake using a multiple-case study approach.

Design/methodology/approach

This study adopted an interpretive multiple-case study approach. The case studies were selected from recently completed construction projects including two infrastructure projects, one commercial project and one residential project. A series of semi-structured interviews were carried out to collect the data. For each case study, four participants were interviewed; these participants represented design, client, supply and building teams.

Findings

The study revealed the main barriers, motivations and opportunities for adoption of PwRC resources in four construction projects. These factors are believed to influence the utilisation of PwRC to varying extents and/or in diverse ways. The findings also suggest that there is a significant opportunity for stakeholders to adopt more sustainable waste management practices, and the use of institutional drivers can help achieve this goal.

Research limitations/implications

The primary research contribution of the study lies in proposing three key research directions: investigating regulatory constraints impacting the use of PwRC, addressing supply chain challenges and enhancing quality assurance.

Originality/value

The research has a practical contribution to the industry through a suite of actionable strategies to increase the uptake of PwRC. The strategies are mostly focussed on stakeholders' education, the regulation that supports PwRC and project management planning. The two major motivations – referring to two of the three pillars of sustainability (economy and environment) – provide a basis for organisational changes to ensure achieving sustainability in construction activities.

Details

Smart and Sustainable Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 21 November 2016

Salman Shooshtarian and Ian Ridley

Assessment of outdoor thermal perception in urban spaces is of particular importance due to its financial, social and ecological consequences. Thermal perception includes four…

Abstract

Purpose

Assessment of outdoor thermal perception in urban spaces is of particular importance due to its financial, social and ecological consequences. Thermal perception includes four elements: thermal sensation votes (TSV), thermal preference (Tpref), overall thermal comfort (Tc) and thermal acceptability (Taccept). Thermal acceptability can offer a benchmark that specifies the acceptable thermal range (ATR), which is useful for urban planners, designers, and bio-meteorologists. ATR, however, can be defined either using direct or indirect measures. The purpose of this paper is to investigate the validity of the indirect measures of ATR, which are most commonly used in outdoor thermal comfort assessments.

Design/methodology/approach

This study was conducted in the context of Melbourne, which has an oceanic temperate climate (Cfb). Three sites forming RMIT University City Campus (RUCC) were selected as the case studies, which were located in the heart of Melbourne Central Business District. A field survey was conducted in RUCC during three seasons, from November 2014 (Spring) to May 2015 (Autumn), which consisted of concurrent field measurements and questionnaire surveys from 9:00 a.m. to 5:00 p.m.

Findings

In total, 1,059 valid questionnaires were collected from the three sites of RUCC. The results of comparative analysis between the different measures of ATR determination showed that the various elements of thermal perceptions expressed the users’ thermal judgements in different ways. Therefore, it was found that the instruction recommended by the thermal comfort standards on the definition of ATR failed to provide an appropriate estimation of ATR for outdoor built environments. The ATR, defined using TSV, therefore, was revised by the direct measure of thermal acceptability. The resulting range showed broader limits in acceptable thermal conditions in RUCC outdoor spaces users. Lastly, the results suggest that in the absence of directly measured acceptability of thermal conditions in field surveys, overall comfort is the most appropriate indirect measure to use.

Originality/value

Some indoor thermal comfort studies have used the alternatives for defining ATR. However, as the applicability of these four methods is yet to be fully explored in outdoor conditions with large weather variations, it is valuable to conduct a comparative analysis among these methods. This study also intended to understand the dynamics of comfort range under non-steady and non-uniform outdoor conditions. The resultant outcome has provided information on the relationship between different measures of thermal perceptions. Ultimately, this research aimed to explore the extent to which the indirect measures of acceptability are considered as a reliable source of information compared to the direct measure.

Details

Smart and Sustainable Built Environment, vol. 5 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 April 2019

Helen Lingard, Amanda Warmerdam and Salman Shooshtarian

In Australia, national harmonisation of occupational health and safety (OHS) regulation was pursued through the development of model Work Health and Safety legislation. The model…

1092

Abstract

Purpose

In Australia, national harmonisation of occupational health and safety (OHS) regulation was pursued through the development of model Work Health and Safety legislation. The model Work Health and Safety Regulations specify that construction works above a threshold cost of AU$250,000 are deemed to be construction projects requiring the appointment of a principal contractor with duties relating to OHS planning and coordination. The purpose of this paper is to explore the effectiveness of the monetary threshold as a suitable trigger for specific OHS planning and coordination duties.

Design/methodology/approach

Interviews were conducted with 46 Australian construction industry stakeholders, including union representatives, employer groups, construction firm representatives and regulators, as well as four international construction OHS experts, to explore perceptions about the effectiveness of the monetary threshold. Two construction scenarios were also modelled to test for variability in operation of the threshold by geographical location of works and design conditions.

Findings

The monetary threshold was perceived to be subject to two forms of capture problem, reflecting inadvertent capture of low risk works or failure to capture high risk works. Organisations were also reported to deliberately split contracts to avoid capture by the threshold. The cost-estimate modelling revealed inequalities and variation in the operation of the monetary threshold by geographic location and design specification.

Practical implications

The analysis suggests that limitations inherent in the use of a monetary threshold to trigger duties relating to OHS planning and coordination in construction works. Opportunities to use more sophisticated risk-based mechanisms are considered.

Originality/value

The study explores a fundamental challenge of risk-based OHS regulation, i.e., how to ensure that workers’ health and safety are adequately protected without creating an unnecessarily high regulatory burden. The research provides evidence that using a monetary value as a proxy measure for OHS risk in construction projects may be problematic.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 March 2020

Salman Shooshtarian, Helen Lingard and Peter S.P. Wong

In an attempt to create national harmonisation of legislation, a set of model Work Health and Safety (WHS) Regulations were developed in Australia. These regulations require…

Abstract

Purpose

In an attempt to create national harmonisation of legislation, a set of model Work Health and Safety (WHS) Regulations were developed in Australia. These regulations require principal contractors to undertake specific WHS planning and coordination activities if the construction works to be completed cost AU $250,000 or more. However, there are some doubts about the usefulness of this monetary threshold. This study aimed to investigate how effective this threshold can be in Australia.

Design/methodology/approach

To evaluate the performance and operation of this threshold in the Australian construction industry, this study modelled the costs of construction for four construction project scenarios – small classroom, two-storey home renovation with adjacent pool, small commercial warehouse and single-storey house (volume home builder) – under various conditions based on historical data (2011–2017) and in eight Australian jurisdictions.

Findings

Among the six study factors (i.e. the types for construction, geographical location, design specification, delivery method, contracting approach and inflation), the research found considerable variation in the operation and performance of the monetary threshold.

Originality/value

The research highlights some potential challenges associated with the use of a monetary threshold in the regulation of WHS planning in construction projects. Thus, the results are expected to contribute to addressing these challenges, leading to the development of an appropriate balance to achieve efficient and effective WHS regulation in Australia.

Details

Built Environment Project and Asset Management, vol. 10 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 18 February 2021

Ali Fathalizadeh, M. Reza Hosseini, Seyyed Saeed Vaezzadeh, David J. Edwards, Igor Martek and Salman Shooshtarian

The barriers to integrating sustainable practices into construction project management require extensive resource allocations to resolve. Within developing countries such as Iran…

1431

Abstract

Purpose

The barriers to integrating sustainable practices into construction project management require extensive resource allocations to resolve. Within developing countries such as Iran (where resources are scarce), remedial strategies adopted must prioritise tackling those barriers that can be expected to yield maximum return on investment. The candidate barriers are many, and this paper aims to identify a hierarchy of barriers, providing a priority list of remedial targets.

Design/methodology/approach

A mixed philosophical stance of interpretivism and post-positivism is adopted within a deductive approach and survey strategy. A list of 30 known barriers are identified from extant literature and used to formulate a questionnaire data collection instrument administered within the Iranian construction industry. Data collected from 176 practitioners are analysed using the relative importance index and Mann–Whitney U test to compare groups based on the participants' demographic variables.

Findings

The findings challenge the common assumption that items related to market and workforce experience are major inhibitors of change. That is, economics and regulatory dependent barriers have a higher impact on the failure of a shift to sustainable practices in Iran. The most influential barriers to incorporating sustainability in construction projects are: (1) lack of understanding of the potential benefits; (2) insufficient cooperation among practitioners, research institutions and environmental organisations; and (3) a lack of a systematic approach to pursuing sustainability goals. No significant associations are detected between the affiliation of the respondents and their attitude towards the issue. Thus, a generalised approach can be applied to a broader range of organisations and construction projects in Iran.

Originality/value

While studies on sustainability impediments at the firm or project level are ubiquitous within literature, this research identifies that the most significant barriers to sustainable project management in Iran, as an underexplored context, are those experienced at the economic and institutional level. Moreover, this novel research presents important insights into the potential effects of participants' demographic profiles on their view of the importance of identified barriers.

Details

Smart and Sustainable Built Environment, vol. 11 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 21 April 2022

Omar Al-Hafith, Satish BK and Pieter de Wilde

Traditional central courtyards have been advocated for being thermally efficient for hot-climate regions. However, exploring previous literature shows that it is not clear to what…

Abstract

Purpose

Traditional central courtyards have been advocated for being thermally efficient for hot-climate regions. However, exploring previous literature shows that it is not clear to what extent courtyards are truly thermally comfortable. This study determines the level of thermal comfort in residential courtyards in hot-climate regions, taking Baghdad as a case study.

Design/methodology/approach

This study develops a novel Courtyard Thermal Usability Index (CTUI) to quantify the ability of courtyards to provide thermal comfort to occupants. CTUI is the fraction of useable thermally comfortable hours in courtyards of the total occupation hours during a specific period. To operationalise CTUI, the research employs the Envi-met 4.2 simulation tool to determine the annual thermal conditions of 360 courtyards. An adaptive thermal comfort model developed by Al-Hafith in 2020 for Iraq is used to judge simulated thermal conditions and determine CTUI.

Findings

CTUI enables determining the level of thermal comfort courtyards offer to occupants by showing the ratio of the thermally comfortable period versus the occupation period. Results show that, in Iraq, annually, courtyards offer up to 38% comfortable hours out of the total potential occupation hours. The rest of the time the courtyard will not be comfortable, mostly due to overheating. When designing courtyards, the most effective geometric property impacting courtyards' thermal conditions is width/height. The most important microclimatic factor impacting occupants' thermal sensation is mean radiant temperature (MRT). This study can be used to inform designing thermally efficient courtyards for hot-climate regions.

Originality/value

This study presents the first assessment of the thermal efficiency of courtyards in hot-climate regions depending on an assessment of their ability to provide thermal comfort to occupants. The study presents a novel index that can be used to quantify the ability of courtyards to provide a thermally comfortable environment to occupants.

Details

Smart and Sustainable Built Environment, vol. 12 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 7 June 2022

Zhen Li, Yutong Jin, Wenjing Li, Qingfeng Meng and Xin Hu

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these…

1986

Abstract

Purpose

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these studies is still lacking. The purpose of this paper is to systematically analyze the impacts of COVID-19 on the different stages of a project life-cycle, and comprehensively sort out the epidemic response measures adopted by project participants. In addition, the study also attempts to explore the challenges and opportunities faced by project management practitioners under the context of COVID-19.

Design/methodology/approach

This study comprehensively demonstrates the systematic review process of COVID-19 related research in the construction industry, systematically summarizes the research status of the impact of COVID-19 on construction projects, and defines the strategies to deal with COVID-19 in project management; and through the visualization research, determines the current key research topics and future research trends.

Findings

This study identifies 11 construction activities in the project management life cycle that are affected by COVID-19 and finds that the COVID-19 epidemic has the greatest impact on construction workers, construction standards, construction contracts and construction performance. The study further summarizes the six main epidemic countermeasures and mitigation measures taken within the construction industry following the arrival of the epidemic. In addition, the results of this study identify opportunities and future trends in intelligent construction technology, rapid manufacturing engineering and project management in the construction industry in the post-epidemic era through literature results, which also provide ideas for related research.

Practical implications

COVID-19 has brought severe challenges to society. It is of great significance for the future sustainable development of the construction industry to identify the impact of COVID-19 on all phases of the project and to promote the development of coping strategies by project stakeholders.

Originality/value

First of all, there is little study comprehensively reviewing the impacts of COVID-19 on the different stages of construction projects and the strategies to deal with the negative impacts. In addition, from a life cycle perspective, the used articles in this study were grouped into different categories based on project stages. This promotes an integrated and comprehensive understanding of historical studies. Moreover, on the basis of a comprehensive review, this paper puts forward future research directions to promote the sustainable development of the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 8 of 8